BRUNY ISLAND FOOTINGS

Our latest micro project under construction on Bruny Island features a contemporary footing system that minimises site disturbance, halfs construction time and can be removed and reused at the end of its life cycle

Mega Anchor foundations reduce the need for costly excavation and drainage on sloping sites, preventing erosion and allows the structure to be built in accordance with the land's natural contour.

The Mega Anchor is quick and easy to instal and is fully load bearing as soon as it has been installed. There is no need to inspect the footings or wait for the concrete to dry

read more HERE